What is included in the air conditioner installation?

Jun 03, 2023

iCrowdMarketing powered by iCrowdNewswire

The installation of a conditioning system is a complex process, which presupposes several stages. Many people erroneously believe that the installation of climatic equipment does not need the work of specialists. However, later, they regret such a decision because incorrectly installed equipment does not cope with its tasks. The air conditioner installation contractor in Denver - more details on the website, the Best Heating Cooling & Air Company, can help you organize the installation process and enjoy the system’s correct functioning afterward.

The steps of the air conditioner installation process


Climatic equipment in recent years has leaped forward. The regular window air conditioners were replaced by complex split systems, which are multi-component. So, their installation had significantly complicated and today, it requires a professional approach.

If you look at the process of the air conditioner installation, you could separate three different stages:

  1. A preparatory work — the stage includes the preparation of the premises for the work by doing marking, drilling holes, assembling communications, and taking away elements that might interfere with the installation of the elements of the system.

  2. Standard installation — the stage includes the installation of the outer and inner elements to make sure the full-fledged work of climatic equipment (inner block, outer block, communication pipes, and the drainage system).

  3. Verification of the correctness of the installation and its working action by a test launch.


On average, the procedure takes three hours but can be significantly longer than that, depending on the necessity of preparations. If an outer block is installed at a high altitude, then industrial climbers must work to install it. When climatic equipment is installed, the specialists consider that the internal components of the system shall not interfere with the people that are to work and live in the rooms. Along with that, free access to all the maintained elements shall be granted so as to perform their regular maintenance and repairs on time.

Preparing to install


You do not simply come and install an air conditioner. The procedure follows after a preparatory stage. First, all possible elements of the old air conditioning system must be removed, if any. One shall be careful in this process: the leakage of the coolant is prohibited and the old system must be properly recycled.

As the specialists get to the installation site, they select the proper places for the elements’ installation. Specific attention must be paid to the installation of the outer block. Its foundation must be maximally reliable in order to carry the weight of the block for many years, not allowing it to fall down. So if you ignore this requirement, the consequences might be even deadly dangerous.

Also, preparatory works make it possible to improve the aesthetic appeal of the installed device. A clever approach allows hiding all the communications, pipes, wires, and drainage, so they don’t deteriorate the interior design.

The procedure of standard installation


Specialists start a standard installation procedure after they will have checked the correctness and the efficiency of all preliminary works. Climatic equipment consists of the following elements:

  • the internal block with a hull

  • the outer block

  • the drainage system with communications

  • the internal evaporator coil

  • the contour of the coolant movement

  • the filter of the system drying

  • high-voltage or low-voltage power lines

  • the condensate collection and removal system.


Each of these elements has specifics of its installation, which cannot be ignored. The particularities differ based on the model of an air conditioner, the volume of the premises, the height of its installation, and other factors. Only highly qualified specialists are capable of professionally considering all these nuances.

Launching the air conditioner system


After the components are installed, the process is not yet finished. Qualified specialists shall run the system test to make diagnostic and estimation of the system’s workability. Climatic equipment is turned on and ran for 20-30 minutes on its maximum output. During that time, they check the efficiency of coolant running, the quality of air temperature gaining, and air circulation.

The installation is only over when the experts make sure the system works effectively and without faults. There are several checked parameters, which must correspond to the producer-defined values.

In the future, the installation company shall be responsible for the regular preventive maintenance of climatic equipment, making sure it functions correctly, and doing periodic checks of the work condition. So it is important that you entrust this works to a verified and professional company, which is able to consider even the smallest nuances of the air conditioner installation and maintenance.

Many-year experience of the Best Heating Cooling & Air Company in Denver allows it to fulfill the installation of even the most innovative split systems. The cost of the installation is calculated beforehand and individually, without any improper and unnecessary extras added to your bill.